Close Menu
    Facebook X (Twitter) Instagram
    IntelliNews
    Facebook X (Twitter) Instagram
    IntelliNews
    Home»UNITED STATES»The Washington Post»Maryland to part ways with Key Bridge contractor after disagreement on cost
    The Washington Post

    Maryland to part ways with Key Bridge contractor after disagreement on cost

    IntelliNewsBy IntelliNewsavril 28, 2026Aucun commentaire1 Min Read
    Facebook Twitter Pinterest LinkedIn Tumblr Email
    Share
    Facebook Twitter LinkedIn Pinterest Email



    The decision to “off-ramp” Kiewit Infrastructure came after negotiations failed to close a gap between the company’s proposal to build the bridge and what state officials believe is acceptable.



    Source link : https://www.washingtonpost.com/dc-md-va/2026/04/28/key-bridge-rebuilt-sean-duffy/

    Author : Steve Thompson, Katie Mettler

    Publish date : 2026-04-28 21:48:00

    Copyright for syndicated content belongs to the linked Source.

    The Washington Post
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    IntelliNews

    Related Posts

    Trump calls on Zelensky to stop attacking Russian energy targets

    septembre 13, 2026

    Trump resists AI slowdown as the political tide turns

    septembre 13, 2026

    Yet another subsidy for a D.C. stadium? Really?

    septembre 13, 2026
    avril 2026
    L M M J V S D
     12345
    6789101112
    13141516171819
    20212223242526
    27282930  
    « Mar   Mai »
    Catégories
    Archives
    Facebook X (Twitter) Instagram Pinterest
    © 2026

    Type above and press Enter to search. Press Esc to cancel.